2024 Street Improvements (2024-105)

The City of Apple Valley 2024 Capital Improvement Program identifies potential street reconstruction and maintenance work. The scope of the project consists of the following:

  • Annual Ring Route Concrete Repairs
  • Gate Valve Replace/Repair 
  • Water Main Break Street Patching
  • Dakota County Pedestrian Improvements
  • Intersection/ADA Improvements
    1. Crosswalk at 142nd St W/Euclid (South Highlands Middle School) per TSAC
    2. Crosswalk with center median at Dodd/Dundee per TSAC
  • Full Depth Mill & Overlay
    1. Heritage Way
    2. 128th Street Court
    3. 134th Street W

 A map of the proposed project area is attached (Figure 1). This project is tentatively scheduled for construction in 2024. 

 The project development tasks for the proposed improvements would involve the following scope of work. 

Conduct a topographical field survey to collect ground elevation, utility locations, and surface features within the proposed work zone.

  • Conduct a geotechnical investigation and soil borings within the work zone.
  • Conduct any stakeholder meetings to discuss the project with business and residents impacted by construction.
  • Prepare plans, specifications, and a project cost estimate.
  • Review project plans and cost estimate with the City Council prior to bid process. 

Contact the Apple Valley Engineering Department at 952-953-2426 or email Jodie.scheidt@applevalleymn.gov for more information.

CLICK HERE FOR MAP OF PROJECT.

2024-105  Figure 1

Contact Us

  1. Brandon S. Anderson, P.E.
    City Engineer
    Email (Not monitored 24 hrs.)

    7100 147th St. W.
    Apple Valley, MN  55124

    Ph: (952) 953-2400
    Fx: (952) 953-2515

    Hours


    Monday - Friday
    8:00 am - 4:30 pm

  1. Project Information
  2. Notices